Rail Road Ties - Vertical Design
1985: Vertical Tie Design
Commack, New York
ITEM- RRT - 11
- Stage 1 - Property Plan and site survey. Plan was to conceal the pool pump and filter.
- Stage 2 - Site preparation to include removal of old; bush, shrubs and roots with our Bobcat. Complete Demolition of all old wall structures. Latter all debris was hauled to land fill and discarded.
- Stage 3 - Bobcat used to backfill behind all walls after construction was completed. This was a brand new vertical wall construction and plan. Latter plants and white stone was added to design.
- All timbers used were; 30 year cca, grade 1, pressure treated lumber.
|
|